Independent marine surveyors & cargo inspection at U.S. ports

    Marine Survey Services

    Steel Cargo Surveys at U.S. Ports

    Pre-loading, stowage and outturn surveys for coils, plate, pipe, rebar and other steel products.

    Why steel cargo is surveyed

    Steel claims are common and often turn on rust and mechanical damage that existed before loading.

    Steel products are rarely in perfect condition when they reach the quay. Atmospheric rust, wet storage and handling damage are common, and if they are not recorded before loading, the carrier may face the claim at discharge. A steel survey records the condition of each lot so that the mate’s receipt and bills of lading can be claused accurately.

    Port cranes at a cargo terminal

    Pre-loading survey

    The surveyor inspects the cargo on the quay or in the warehouse before it is loaded, lot by lot.

    • Rust: extent and type, from light atmospheric to heavy or pitting
    • Wetness and whether it is fresh or salt water, using a silver nitrate test where needed
    • Mechanical damage: dented edges, bent coils, telescoping, damaged bands
    • Packing condition and marks against the documents

    The findings support remarks on the mate’s receipt. Owners can then decide, with their P&I club, on the clausing of bills of lading.

    Loading, stowage and securing

    During loading, damage often comes from handling and stowage.

    The surveyor records handling methods, dunnage, stowage and lashing, hold condition and weather stoppages. Where steel is loaded in rain, the surveyor records the time hatches were open. See loading and discharge supervision.

    Discharge and outturn

    At discharge, the surveyor compares outturn condition with the loading record.

    Damage found at discharge is recorded, measured and photographed, and compared with the pre-loading survey where one exists. For receivers, the survey supports a claim; for carriers and clubs, it supports a defense.

    Steel survey questions

    For owners, P&I clubs, shippers and receivers.

    Do P&I clubs require pre-loading steel surveys?

    Many clubs recommend or require them for certain steel cargoes. Check your club’s guidance.

    What does the silver nitrate test show?

    It indicates whether wetness or rust contains chlorides, which suggests salt water.

    Can the survey be done in the warehouse before the vessel arrives?

    Yes, which often saves time during loading.

    Need an independent surveyor at a U.S. port?

    Send the vessel, port, ETA and survey type. We review the scope, check surveyor availability and conflicts, and confirm the appointment in writing before anyone attends.

    How an appointment works

    1. You send the vessel, port, ETA and scope.
    2. We review the scope and check surveyor availability and conflicts.
    3. You receive a written quotation and the proposed surveyor.
    4. On your written instruction, the surveyor attends and reports.

    Requests are read around the clock. Attendance is confirmed case by case.

    Urgent, vessel alongside?
    +1 979-250-7486
    WhatsApp +1 979-250-7486

    Request a Marine Surveyor

    Vessel, port and survey type are enough to start. Details and documents can follow.